  • General
       The design of the crane complies with the following rules:
    API-2C “Specification For Offshore Pedestal Mounted Cranes (2004)”
    ABS “Guide for Certification of Lifting Appliance (2007)”
    API-9A “Specification for Wire Ropes”
    AWS D1.1 “Structural Welding Code—Steel”
    AISC “Manual of Steel Construction—Allowable Stress Design, 9th Edition”
    Main Technical Parameters
        Main Hook Whip hook
       SWL/Working radius Please see load capacity curve of general drawing
       Hoisting Speed Full load ~18m/min ~67m/min
       Hoisting Height 95m 100m
       Slewing speed 0~0.85r/min
       Slewing angle >360º
       Luffing angle 15º~82º
       Luffing time ~180s
       Stowing angle for boom -5º~15º
       Working sea state Grade 4~5
       Electric motor
         Type Y400M1-4-H Y355M-4-H
         Power 400kW 250kW
         Speed 1790r/min 1790r/min
         Source AC440V, 60Hz, 3Ph
         Working duty S1
    Vertical dynamic coefficient calculation
    Calculation of dynamic coefficient for onboard lifts of main hook by “ General method”:
       Dynamic coefficient for onboard lifts:
         CV0=1.33+0.0012HsigHsig=1.33+0.0012×6.892=1.39<1.40
    There: Hsig—Sea significant wave height, for sea state of grade 4~5,
             Hsig=2.1m=6.89ft
    So take CV0=1.40
    Calculation of dynamic coefficient for offboard lifts of main hook by “ General method”:
       Vertical velocity of the supply boat deck supporting the load:
         Vd=0.6Hsig=0.6×6.89=4.13ft/s
       Vertical velocity of the crane boom tip due to crane base motion:
         Vc=0.05HsigHsig=0.05×6.892=2.37ft/s
       Actual steady hoisting velocity for the SWL to be lifted: Vh=18m/min=0.98ft/s
       Relative velocity: Vr=Vh+(Vd2+Vc2)0.5=0.98+(4.132+2.372)0.5=5.74ft/s
       Dynamic coefficient for offboard lifts:
         CV=1+Vr(K2/gSWL2)0.5=1+5.74×[155814.2/(32.2×154322)]0.5=2.02
       There: K2—Vertical spring rate of the crane at main hook,
            pre-take K2=2274N/mm=155814.2Lb/ft
        g—Acceleration due to gravity, g=32.2ft/s2
        SWL2—Safe working load, SWL2=70000kg=154322Lb
    Calculation of dynamic coefficient for offboard lifts of whip hook by “ General method”:
       Actual steady hoisting velocity for the SWL to be lifted: Vh=67m/min=3.66ft/s
       Relative velocity: Vr=Vh+(Vd2+Vc2)0.5=3.66+(4.132+2.372)0.5=8.42ft/s
       Dynamic coefficient for offboard lifts:
         CV=1+Vr(KW/gSWLW)0.5=1+8.42×[44537.9/(32.2×44092)]0.5=2.49
       There: KW—Vertical spring rate of the crane at whip hook,
            pre-take K3=650N/mm=44537.9Lb/ft
        g—Acceleration due to gravity, g=32.2ft/s2
          SWLW—Safe working load, SWLW=20000kg=44092Lb...